Verti-Drain®

Overview

Specification

Verti-Drain®

Prefabricated Vertical Drain (wick drain) for Soft Ground Improvement

Overview

Verti-Drain® is a pocket-style prefabricated vertical drain (PVD) for the improvement of soft ground made from a mechanically strong PP core and a nonwoven filter jacket specialized for PVD application. The product quality of Verti-Drain® is assured by many certificates including ISO9001, CE, Q-mark, R-mark, Eco-Label, etc.

Since Verti-Drain® is produced with filter materials having AOS suitable for the improvement of soft soil, filter clogging can be prevented over a long term. Verti-Drain® is resistant to friction and scratching caused during its installation and also has a physically durable structure with a high strength. Verti-Drain® has a high resistance to bacteria and chemicals. Verti-Drain® is materially and ecologically stable since it is made of polymers which don’t cause contaminants.

FAQ For Verti-Drain®

Q1. What is Verti-Drain®?

Verti-Drain® is a prefabricated vertical drain(PVD), also known as a wick drain, used to accelerate soft ground consolidation by discharging pore water from soil layers.

Q2. Where is Verti-Drain® used?

It is used in seaports, airports, roads, railways, reclaimed land, industrial complexes projects built on soft ground – installed at depth of up to 60m.

Q3. What is Verti-Drain® made of?

Verti-Drain® consists of a mechanically strong polypropylene(PP) core and a nonwoven filter jacket, CE-certified to EN 132

Q4. What makes Verti-Drain® suitable for large infrastructure projects?

With over two billion metres supplied across 30+ countries since 1987, Verti-Drain® offers proven performance, certified quality, and an industry-leading discharge capacity that ensures rapid pore water dissipation even under high confining pressures (ASTM D 4716).

Applications of Verti-Drain®

Verti-Drain® is applied for speeding up the consolidation of soft ground, accordingly reducing a construction time, for various infrastructure and land development projects including;

  • Construction of seaports, airports, roads & railways
  • Construction of oil & gas facilities, power and chemical plants
  • Improvement of dredged clay fill
  • Reclamation and bank revetment
  • Land development for residential and industrial complex

Major Projects

As of 2019, more than 1 billion linear meters of Verti-Drain® have been supplied worldwide to many infrastructure projects including Singapore Changi International Airport, Kuwait Bubiyan Port, Kuwait Mubarak AI Kabeer Port, Vietnam Hanoi-Haiphong Expressway, Egypt Port Said East Industrial Zone, Busan Newport, Incheon International Airport, Saemangeum Reclamation and many others.

Year Project Name  Quantity 







2025




Singapore Tuas Terminal Reclamation Phase 2 (Finger 3) 10,281,600m
Singapore Management of Staging Ground & Infilling Works (Tekong 3) 6,512,050m
Indonesia Semarang-Demak Toll Road 10,780,000m
Philippines MICT berth 8 Expansion Phase 2 1,010,000m
Malaysia 3E-BINAMUHIBBAH-KUCHING SAMARAHAN 1,250,000m
Iraq Al Faw Service Berth 700,000m
Myeongji District Phase 2, Sec 2 Site Prep (Busan-Jinhae FEZ) 5,500,000m
Pyeongtaek-Dangjin Port Phase 2-3, Type 1 Hinterland Dev. 2,400,000m
Mexico Natura Project 1,000,000m
UK Chatteris Project 453,600m
Ecuador Warehouse 3 & 4 Fertilizer Port Terminal 354,900m
New Honam Ash Disposal Area Ground Stabilization 2,672,040m
2024 Singapore Management of Staging Ground & Infilling Works (Tekong 3) 3,809,400m
Singapore Tuas Terminal Reclamation Phase 2 (Finger 3) 13,456,800m
Indonesia Semarang-Demak Toll Road 1B 8,525,500m
Indonesia IKN VVIP Airport Project 2,388,040m
Gwangyang Logistics Complex  13,065,360m
2023 Guyana Gas to Energy Onshore 7,103,900m
Indonesia Kalibaru Port Phase 1 and Phase 2 7,958,500m
Egypt Alexandria Project 5,021,680m
2022 Singapore Construction of Polder at Areas A & C of Pulau Tekong 11,982,600m
Egypt Al Hamam City Project 6,300,360m
Bangladesh Special Economic Zone (SEZ) 11,727,100m
2021 Kuwait Access Road to MKP in Boubyan Island 12,600,000m
Singapore Tuas West Coast 12,448,800m
Hong Kong Tung Chung Newtown Reclamation  5,310,400m
Indonesia PIK 2A Island 3,420,300m
Saemangeum Industrial Complex Phase 2 3,500,000m
Singapore Construction for Land Reclamation at Changi East (CO2) 16,871,400m
2020 Egypt Alexandria Port Project 7,077,800m
Singapore Changi East Industrioal Zone (CEIZ) 3,500,000m
2019 Iraq Umm Qasr Yard 5 Development 2,293,000m
2018 Singapore Construction of Polder at Pulau Tekong 30,000,000m
Reclamation at Ayer Merbau Phase2 10,000,000m
2017 Tunis Bay Project 3,300,000m
Hong Kong Airport 3RS Project 23,700,000m
2016 Poland S7 Expressway 5,800,000m
Indonesia CirebonⅡ Power Plant 8,250,000m
2015 Singapore JIWE Phase 2 15,000,000m
Kuwait Sheikh Jaber Al-Ahmad Al-sabah Causeway Project 19,800,000m
2014 Vietnam Lach Huyen Port Infrastructure Project 8,000,000m
Busan-Jinhae FEZ Ungdong Reginal Development Phase 1 2,500,000m
2013 Kuwait Mubarak Al Kabeer Seaport Phase 1 10,000,000m
Vietnam Steel Structure Fabrication Plant ⅡA 2,630,000m
2012 Kuwait Mubarak Al Kabeer Seaport Phase 1 20,000,000m
Vietnam Formosa Steel Plant Project Phase 1 8,500,000m
2011 Vietnam GemaLink Container Terminal, Phase 1 11,000,000m
Kuwait Boubyan Seaport Phase 1 20,000,000m
2010 Masan Marine City Development 2,750,000m
Vietnam POSCO Projects 2,600,000m
2009 Vietnam Cai Mep Container Terminal 2,500,000m
Busan Newport Ungdong Support Area Section 1, 2 35,000,000m
2008 Busan Newport South Container Terminal Section 2-3 24,500,000m
Gwangyang Port West Support Area Section 1 9,000,000m
2007 Busan Newport Support Area Section 2 5,000,000m
F-1 Race Track Construction 9,500,000m
2006 Gwangyang Port West Access Railway 5,080,000m
Yeochun National Ind. Complex Extention Section 1 12,000,000m
2005 Yangsan Mulgeum Building Site Development Phase 3 19,600,000m
Busan Newport South Container Terminal Section 2-2 9,200,000m
2004 Busan Newport Support Area Section 3 8,500,000m
Gwangyang Port Phase 3 Stage 2 20,000,000m
2003 Namak Newtown Development Section 1-1 11,000,000m
Busan Newport Support Area Section 1 17,000,000m
2002 Busan Newport North Container Terminal 28,000,000m
Pyungtaek LNG Production Complex 6,500,000m
2001 Incheon Song-Do Newtown Development 1,800,000m
Busan Gyeongnam Race Park 15,000,000m
2000 Yangsan ICD Access Railway 1,300,000m
Gwangyang Port Container Terminal Phase 2 4,800,000m
1999 Noksan Industrial Complex Phase 2 Section 1&5 3,000,000m
Changi International Airport in Singapore 5,000,000m
1998 Incheon New Airport Land Development Section 4, 6 5,000,000m
Changi International Airport in Singapore 12,000,000m